Monday, April 26, 2010
Little snags
I guess there are going to be little snags. Turns out the size of the lot was not approved by Town and COuntry. This seems to be a fault with the developer, but what it means is that the deed has one size but T&C has anther SMALLER size. When I go to the bank to secure a loan the discrepancy will send me right back to T&C for re-approval. T&C have indicated that I need to get the developer to sort out the survey. Sigh. Let's hope this is done quickly.
Monday, April 5, 2010
Met with the draftsman
Got the final blueprints in hand. Everything down to the last roof tie. Looks good. He says estimated time to getting Town & Country approval is 2 months from today. Lets see how that works out. Still need to get WASA approval separate but he says that won't be a problem.
Very excited.
Very excited.
Saturday, April 3, 2010
Still waiting
Waiting on my draftsman to collect a copy of the deed to we can sort our the land surveyor's report. Sigh. things being mired in molasses at this stage. Need things to get moving. will ask for a updated timeline from him.
Subscribe to:
Comments (Atom)